Structural Engineering · Drg No. MHBR-06 · RCC Beam Reinforcement
BEAM REINFORCEMENT DETAILS
Mayank's House · G+1 Residential · Plinth PB 300×450 · GF GB 230×450 · FF FB 230×375 · M20 / Fe500 · IS 456:2000
PB: 300×450
GB: 230×450
FB: 230×375
Bot: 2T16/2T12
Top: 2T12/2T10
T8@100/150
DRG. NO. MHBR-06
DATE: 01.03.2026
SCALE: NTS
REV: 00
Plinth Beam PB
GF Beam GB
FF Beam FB
Cross-Sections
BBS + Notes

PLINTH BEAM — PB 300×450mm

Sheet 1 of 5 · +450mm NGL
3-span continuous elevation · 3500+3500+4000mm · 2T16 bottom + 2T12 hanger + extra 2T12@supports · T8 stirrups @100(conf)/@150(mid)
300
Width mm
450
Depth mm
2T16
Bottom
2T12
Hanger
+2T12
@ Supports
T8
Stirrups
396
d eff. mm

PB LONGITUDINAL ELEVATION — GRID B : B1 → B4 (11000mm) — REPRESENTATIVE OF ALL 7 BEAM LINES

CONTINUOUS OVER B2 & B3 · CONFINEMENT ZONES L/6 FROM COLUMN FACE · NOT TO SCALE
NGL +450 + 2T12 top (L/4 ea.) + 2T12 top (L/4 ea.) SPAN 1: 3500mm SPAN 2: 3500mm SPAN 3: 4000mm ★ @100 @100 @150 @100 @150 @100 @100 @120 @100 B1 B2 B3 B4 2T16 BOT (continuous) 2T12 TOP hanger +2T12 extra @ int.supports T8 stirrups @100/@150 3500 mm 3500 mm 4000 mm ★ ← 11000 mm TOTAL → 450mm +450
2T16 Bottom (continuous + hooks)
2T12 Top Hanger
+2T12 Extra @ supports (L/4 each side)
T8 Stirrups @100(conf)/@150(mid)
Confinement Zone L/6 from col. face

BENDING MOMENT DIAGRAM (SCHEMATIC)

3-SPAN CONTINUOUS · SAGGING = BOT STEEL · HOGGING = TOP STEEL
+M → 2T16 BOT −M → +2T12 TOP −M → +2T12 TOP 3500mm 3500mm 4000mm★ B1 B2 B3 B4

PB DESIGN PARAMS

IS 456
ParameterValue
Section300×450mm
Clear cover30mm (stirrup face)
d effective396mm
Bottom steel2T16 → Ast 402mm²
Top hanger2T12 → 226mm²
Extra top2T12 @ each support
Extent of extra topL/4 each side of col
Stirrups normalT8 @ 150mm c/c
Stirrups conf.T8 @ 100mm (L/6)
Confinement L/6583mm from col. face
Lap length T16800mm (50d min)
Anchorage Ld600mm into column
Grade concreteM20 (fck=20)
Grade steelFe500 (fy=500)

GF BEAM — GB 230×450mm

Sheet 2 of 5 · +3450mm GF SLAB SOFFIT
Narrowed to 230mm · Same depth 450mm · Carries GF slab + FF column loads · 2T16 bottom · 2T12 hanger · T8@100/150
230
Width mm
450
Depth mm
2T16
Bottom
2T12
Hanger
+2T12
@ Supports
T8
Stirrups
404
d eff. mm

GB LONGITUDINAL ELEVATION — 3 SPANS (3500+3500+4000mm)

SAME SPANS AS PLINTH · 230mm WEB (vs 300 PB) · SAME STEEL ARRANGEMENT · GF SLAB 125mm ABOVE
GF SLAB 125mm (cast monolithic with beam) FFL +2T12 (L/4) +2T12 (L/4) 3500 3500 4000★ B1 B2 B3 B4 ← 2T16 BOT ← 2T12 TOP hanger 3500 3500 4000★ ← 11000 mm TOTAL → 450
2T16 Bottom (same as PB)
2T12 Top Hanger
+2T12 Extra @ supports
T8@100/150
GF Slab 125mm above

FF / ROOF BEAM — FB 230×375mm

Sheet 3 of 5 · +6450mm ROOF LEVEL
Reduced depth 375mm (lighter roof only) · 2T12 bottom (vs 2T16 GF) · 2T10 hanger · T8@100/150 · same 3 spans
230
Width mm
375
Depth mm
2T12
Bottom
2T10
Hanger
+2T10
@ Supports
T8
Stirrups
331
d eff. mm

FB LONGITUDINAL ELEVATION — ROOF BEAM (3500+3500+4000mm)

DEPTH REDUCED TO 375mm · 2T12 BOT (vs 2T16 GF) · 2T10 HANGER · ROOF SLAB + WATERPROOFING ABOVE
ROOF SLAB 125mm + Waterproofing 50mm brick bat coba above FFL +2T10 (L/4) +2T10 (L/4) 3500 3500 4000★ ×-1 ×-2 ×-3 ×-4 ← 2T12 BOT (vs 2T16 GF) ← 2T10 HANGER (vs 2T12) 3500 3500 4000★ ← 11000 mm TOTAL → 375
2T12 Bottom (reduced from 2T16)
2T10 Hanger (reduced from 2T12)
+2T10 Extra @ supports
T8@100/150
Roof Slab + Waterproofing

BEAM CROSS-SECTIONS — ALL 3 TYPES

Sheet 4 of 5 · AT MID-SPAN
Sections at mid-span showing bar arrangement · cover · effective depth · stirrup detail · neutral axis

PB — 300×450mm CROSS-SECTION

2T16 BOT · 2T12 TOP · T8@150 · c=30mm
SECTION A–A · PB T16 T16 T12 T12 NA COMPRESSION TENSION b = 300mm D = 450mm d = 396mm c=30 T8@150 135° hook c/c spacing ≈ 118mm < 300mm ✓

GB — 230×450mm CROSS-SECTION

2T16 BOT · 2T12 TOP · T8@150 · c=30mm
SECTION B–B · GB T16 T16 T12 T12 NA COMPRESSION TENSION b = 230mm D = 450mm d = 404mm c=30 T8@150 230mm wide vs 300mm PB Narrower → lighter formwork

FB — 230×375mm CROSS-SECTION

2T12 BOT · 2T10 TOP · T8@150 · c=30mm
SECTION C–C · FB T12 T12 T10 T10 NA COMPRESSION TENSION b = 230mm D = 375mm d = 331mm c=30 T8@150 D=375mm (vs 450 GF) Reduced: roof load only LL=1.5 kN/m²

SECTION OVER SUPPORT — HOGGING ZONE

ALL BEAM TYPES · TOP BARS ACTIVE · EXTRA STEEL IN TENSION
HOGGING ZONE (−M) 2T12 top (continuous) +2T12 extra +2T12 extra L/4=875mm L/4=875mm 2T16 bot (cont. past support) @100 (L/6) @100 (L/6) COLUMN SUPPORT 300×300mm

BEAM–COLUMN JOINT ANCHORAGE

HOOK DETAIL · BEAM BARS INTO COLUMN
T16 bottom bar 90° hook into col T12 top bar Ld ≥ 600mm Column width = 300mm Col. bars: 4T16+2T12 GF T8@100 conf. col.stirrups through joint zone

BAR BENDING SCHEDULE — ALL BEAMS

Sheet 5 of 5 · COMPLETE BBS
Indicative quantities for PB + GB + FB · all beam lines · total steel tonnage · IS 456 compliance notes

COMPLETE BBS — PB + GB + FB

ALL 7 LONGITUDINAL + 4 TRANSVERSE BEAM LINES × 3 FLOORS
MarkBeamBar DiaPositionCut Len/barNo. BarsTotal mWt (kg)
PLINTH BEAM PB (300×450mm) — 7 beam lines
PB-B1PB Longitudinal (×3)T162 nos. Bottom cont.116003×2=669.6m109
PB-B2PB Transverse (×4)T162 nos. Bottom cont.81004×2=864.8m102
PB-H1PB Longitudinal (×3)T122 nos. Top hanger11600669.6m62
PB-H2PB Transverse (×4)T122 nos. Top hanger8100864.8m58
PB-E1All PBT12Extra top @ int.sup.2000~4896m86
PB-S1All PBT8Rect. stirrups1500~560840m332
GF BEAM GB (230×450mm) — 7 beam lines
GB-B1GB Longitudinal (×3)T162 nos. Bottom cont.11600669.6m109
GB-B2GB Transverse (×4)T162 nos. Bottom cont.8100864.8m102
GB-H1All GBT12Top hanger + extra14+48227m202
GB-S1All GBT8Rect. stirrups 150×3901180~560661m261
FF BEAM FB (230×375mm) — 7 beam lines
FB-B1FB Longitudinal (×3)T122 nos. Bottom cont.11600669.6m62
FB-B2FB Transverse (×4)T122 nos. Bottom cont.8100864.8m58
FB-H1All FBT10Hanger + extra top14+48227m140
FB-S1All FBT8Rect. stirrups 150×3151010~560566m223
PLINTH BEAM TOTAL
T16: ~211 kg
T12: ~206 kg
T8: ~332 kg
≈ 749 kg
GF BEAM TOTAL
T16: ~211 kg
T12: ~202 kg
T8: ~261 kg
≈ 674 kg
FF BEAM TOTAL
T12: ~120 kg
T10: ~140 kg
T8: ~223 kg
≈ 483 kg
T16 All Beams
422 kg
T12 / T10 All
548 kg
T8 Stirrups All
816 kg
GRAND TOTAL BEAMS
1906 kg

BEAM SIZE COMPARISON

ALL 3 FLOORS
PropertyPB PlinthGB GroundFB First
Width b300mm230mm230mm
Depth D450mm450mm375mm
d effective396mm404mm331mm
Bottom bars2T162T162T12
Ast bottom402mm²402mm²226mm²
Top hanger2T122T122T10
Extra top+2T12+2T12+2T10
StirrupsT8@150T8@150T8@150
Conf. stirrupsT8@100T8@100T8@100
Cover30mm30mm30mm
Level+450mm+3450mm+6450mm
Design LL3.0 kN/m²2.0 kN/m²1.5 kN/m²
Steel total~749 kg~674 kg~483 kg

ENGINEERING NOTES

IS 456:2000 · IS 13920 · SP 16
Design Code: IS 456:2000 · Limit State Method
· All beams: M20 concrete + Fe500 steel
· Cover to stirrup face: 30mm all beams
· Beams are continuous over all intermediate supports
· Extra top bars extend L/4 beyond each column face
· Confinement zone L/6 from column face → T8@100
· Normal mid-span zone: T8@150mm stirrups
· 4m span (Bay 3→4): stirrups at @120mm mid
· Lap splice at mid-span only (away from high-moment zones)
· Lap length T16: 800mm · T12: 600mm · T10: 500mm
· Anchorage (Ld) into column: min 600mm with 90° hook
· Stirrup 135° hook at one corner, alternating each stirrup
· Beams cast monolithic with slabs — pour in one operation
· Minimum 2 bars top & bottom per IS 456 Cl. 26.5.1.1