12
Total Footings
F1+F2
Footing Types
1.8m
Depth BGL
M20
Concrete Grade
Plan Views — Footing Top Face
Sheet 1 of 3
Reinforcement layout as seen from top · Dimensions in mm
F1 — Plan View (1200×1200mm)
AT CORNERS & EDGES · QTY: 8
━ Main: 7T12 @150 (Bot)
━ Dist: 7T12 @150 (Top)
■ Column: 300×300
━ Dist: 7T12 @150 (Top)
■ Column: 300×300
Cover: 50mm
Grade: M20 / Fe500
Qty: 8 nos.
Grade: M20 / Fe500
Qty: 8 nos.
F2 — Plan View (1400×1400mm)
AT CENTRAL SPINE (B-COLS) · QTY: 4
━ Main: 9T12 @150 (Bot)
━ Dist: 9T12 @150 (Top)
■ Column: 300×300
━ Dist: 9T12 @150 (Top)
■ Column: 300×300
Cover: 50mm
Grade: M20 / Fe500
Qty: 4 nos. (B-Spine)
Grade: M20 / Fe500
Qty: 4 nos. (B-Spine)
Reinforcement Schedule
BOTH FOOTING TYPES| Mark | Size | Main Bar | Dist Bar | Cover | Qty |
|---|---|---|---|---|---|
| F1 | 1200×1200×450 | 7T12 @150 | 7T12 @150 | 50mm | 8 |
| F2 | 1400×1400×450 | 9T12 @150 | 9T12 @150 | 50mm | 4 |
| PCC | M10, 100mm thick, Ftg size +150mm each side | — | 12 | ||
| Param | F1 Value | F2 Value |
|---|---|---|
| Footing size | 1200×1200 | 1400×1400 |
| Thickness | 450 mm | 450 mm |
| PCC size | 1500×1500 | 1700×1700 |
| PCC thick. | 100 mm | 100 mm |
| Steel (main) | 7T12 @150 | 9T12 @150 |
| Steel (dist.) | 7T12 @150 | 9T12 @150 |
| Concrete | M20 (fck=20 N/mm²) | |
| Steel grade | Fe500 (fy=500 N/mm²) | |
| SBC assumed | 150 kN/m² | |
Bar Bending Notes
· Both layers extend to full cover-to-cover length
· Main bars (T12) placed at bottom layer
· Dist bars (T12) placed on top of main bars
· Provide L-shaped starter bars at column location
· Lap length for T12: min 500mm
· Both layers extend to full cover-to-cover length
· Main bars (T12) placed at bottom layer
· Dist bars (T12) placed on top of main bars
· Provide L-shaped starter bars at column location
· Lap length for T12: min 500mm
Section Views — Footing Depth Detail
Sheet 2 of 3
Longitudinal section through footing centre · All dimensions in mm
F1 — Section X–X (1200×1200×450mm)
CORNER / EDGE COLUMNS · T12 @150F2 — Section Y–Y (1400×1400×450mm)
CENTRAL SPINE B-COLUMNS · T12 @150Column Section Detail & Depth Analysis
Sheet 3 of 3
Column reinforcement cross-section · Depth schedule · Engineering notes
Column Section Detail (300×300mm) & Layer Sequence
4T16 MAIN + T8@150 STIRRUPS · CLEAR COVER 40mmColumn X-Section at Footing
● 4T16 main bars (corners)
□ T8 stirrups @150mm c/c
Clear cover: 40mm
Min. lap: 48×16 = 768mm ≈ 800mm
Column: M20 / Fe500
□ T8 stirrups @150mm c/c
Clear cover: 40mm
Min. lap: 48×16 = 768mm ≈ 800mm
Column: M20 / Fe500
Foundation Layer Sequence
Depth Schedule
ALL DIMS IN mm| Layer | Material | Thickness |
|---|---|---|
| PCC Bed | M10 Concrete | 100 mm |
| Footing | M20 / Fe500 | 450 mm |
| Col Stub | M20 / Fe500 | 1250 mm |
| Tie Beam | M20 / Fe500 | 300×450 mm |
| Backfill | Murum/soil | 1250 mm |
| Plinth | Brick / RCC | +450 mm |
Engineering Notes
SITE GUIDELINES
Foundation
· Verify SBC before casting — min. 150 kN/m²
· Increase footing to 1500×1500 if soft soil
· Anti-termite chemical treatment before PCC
· Waterproofing coat on all footing sides
Concrete
· PCC: M10 · Footing + Column: M20
· Curing: minimum 28 days water curing
· Do not cast footing on loose/wet soil
Reinforcement
· Steel: Fe500 (HYSD bars, ISI marked)
· Main bars lap length: min. 500mm
· Column starter bars: 800mm above footing
· Provide U-hooks at footing corners
Sequence of Work
1 · Excavation → 2 · Anti-termite → 3 · PCC
4 · Footing steel → 5 · Column starters
6 · Pour M20 → 7 · Cure → 8 · Backfill
9 · Plinth beam → 10 · GF slab
· Verify SBC before casting — min. 150 kN/m²
· Increase footing to 1500×1500 if soft soil
· Anti-termite chemical treatment before PCC
· Waterproofing coat on all footing sides
Concrete
· PCC: M10 · Footing + Column: M20
· Curing: minimum 28 days water curing
· Do not cast footing on loose/wet soil
Reinforcement
· Steel: Fe500 (HYSD bars, ISI marked)
· Main bars lap length: min. 500mm
· Column starter bars: 800mm above footing
· Provide U-hooks at footing corners
Sequence of Work
1 · Excavation → 2 · Anti-termite → 3 · PCC
4 · Footing steel → 5 · Column starters
6 · Pour M20 → 7 · Cure → 8 · Backfill
9 · Plinth beam → 10 · GF slab