300
Beam Width mm
450
Beam Depth mm
12
Beam Spans
4m
Max Span
2T16
Bottom Steel
2T12
Top (Hanger)
Plinth Beam Layout Plan
Sheet 1 of 4
Top view showing all tie beams along grid lines A–C × 1–4 · Beam IDs labelled · All dims in mm
Plinth Beam Plan — Top View at +450mm NGL
BEAMS ALONG ALL GRID LINES · 300×450mm THROUGHOUT · 12 SPANSPlinth Beam 300×450mm
Column 300×300mm
Bay Zone
Section Cut X–X
Beam ID & Span Schedule
ALL 7 BEAM LINES · 12 SPANS| Beam ID | Direction | Span | From→To | Size |
|---|---|---|---|---|
| PB-LA | Long. | 3×(3.5+3.5+4.0)m | A1→A4 | 300×450 |
| PB-LB | Long. | 3×(3.5+3.5+4.0)m | B1→B4 | 300×450 |
| PB-LC | Long. | 3×(3.5+3.5+4.0)m | C1→C4 | 300×450 |
| PB-T1 | Trans. | 2×3800mm | A1→C1 | 300×450 |
| PB-T2 | Trans. | 2×3800mm | A2→C2 | 300×450 |
| PB-T3 | Trans. | 2×3800mm | A3→C3 | 300×450 |
| PB-T4 | Trans. | 2×3800mm | A4→C4 | 300×450 |
| Span Type | Length | Beam Steel | Stirrups |
|---|---|---|---|
| 3.5m (Long.) | 3500mm | 2T16 bot + 2T12 top | T8@150 |
| 3.8m (Trans.) | 3800mm | 2T16 bot + 2T12 top | T8@150 |
| 4.0m (Long. ★) | 4000mm | 2T16 bot + 2T12 top | T8@120 |
Beam Cross-Section
300×450 ALL BEAMSSection X–X — Longitudinal Section through PB-LB
Sheet 2 of 4
Section through central B-line beam · Showing 3 spans: 3500 + 3500 + 4000mm · Steel curtailment · Depth from NGL
PB-LB Longitudinal Section — B1 to B4 (11000mm total)
3 SPANS: 3500+3500+4000mm · 2T16 BOT · 2T12 TOP · T8 STIRRUPS · ALL DIM IN mm2T16 Bottom (Main)
2T12 Top (Hanger + Extra @ supports)
T8 Stirrups @150/120
Confinement Zone @100
Footing (schematic)
Beam End Detail, Section AA & Bar Bending Schedule
Sheet 3 of 4
End bearing · Section at mid-span · Full reinforcement schedule · All dims in mm
Beam End at Column — Detail
BEARING · L-ANCHOR BARS · COLUMN PASS-THROUGHSection A–A (Mid Span)
SAGGING MOMENT ZONE · 2T16 BOT · 2T12 TOPBar Bending Schedule
PLINTH BEAM · ALL SPANS| Mark | Bar | Shape | L/Bar | Nos | Total |
|---|---|---|---|---|---|
| B1 | T16 | Straight+hook | 3800mm | 2×7 | 53.2m |
| B2 | T16 | Straight+hook | 4300mm | 2×4 | 34.4m |
| H1 | T12 | Straight | 3800mm | 2×7 | 53.2m |
| H2 | T12 | Straight | 4300mm | 2×4 | 34.4m |
| E1 | T12 | Straight+hook | L/2+600 | 2×12 | ~96m |
| S1 | T8 | Rect.220×390 | 1340mm | 12×~18 | ~290m |
| S2 | T8 | Rect.220×390 | 1340mm | 4m×~22 | ~118m |
Steel Estimate
T16 total:87.6m → ~138 kg
T12 total:183.6m → ~163 kg
T8 stirrups:408m → ~161 kg
Grand Total:~462 kg
Engineering Notes
· Beam sits at plinth level: top = FFL +450mm
· All beams are continuous over columns
· Extra 2T12 over supports for hogging
· Anchor all bars Ld=600mm into columns
· Stirrup hook: 135° with 10d extension
· Confinement zone: T8@100 for L/6=583mm
· Cover to stirrup: 30mm clear
· Anti-termite treatment before casting
· Curing: minimum 14 days
· Beam sits at plinth level: top = FFL +450mm
· All beams are continuous over columns
· Extra 2T12 over supports for hogging
· Anchor all bars Ld=600mm into columns
· Stirrup hook: 135° with 10d extension
· Confinement zone: T8@100 for L/6=583mm
· Cover to stirrup: 30mm clear
· Anti-termite treatment before casting
· Curing: minimum 14 days