GF Slab Reinforcement Plan
Sheet 1 of 4 · +3450mm Level
125mm solid slab · Main bars T10@150 along short span · Dist. bars T8@200 along long span · All dims in mm
125
Depth mm
6
Slab Panels
T10
Main @150
T8
Dist @200
T10
Top @150
20mm
Cover
M20
Grade
+3450
Level mm
GF Slab Plan — Reinforcement Layout at +3450mm
6 PANELS · TWO-WAY WHERE ly/lx ≤ 2 · MAIN BARS T10@150 · DIST T8@200 · TOP T10@150 @ SUPPORTST10@150 Main (short span, lx)
T8@200 Dist (long span, ly)
T10@150 Top @ supports
Beam / Wall below
GF Slab Panel Schedule
IS 456 TABLE 26 DESIGN| Panel | lx (short) | ly (long) | ly/lx | Type | Bot (lx dir) | Bot (ly dir) | Top |
|---|---|---|---|---|---|---|---|
| S1 | 3500 | 3800 | 1.09 | Two-Way | T10@150 | T8@200 | T10@150 |
| S2 | 3500 | 3800 | 1.09 | Two-Way | T10@150 | T8@200 | T10@150 |
| S3 | 3500 | 3800 | 1.09 | Two-Way | T10@150 | T8@200 | T10@150 |
| S4 | 3500 | 3800 | 1.09 | Two-Way | T10@150 | T8@200 | T10@150 |
| S5★ | 3800 | 4000 | 1.05 | Two-Way | T10@125 | T8@175 | T10@125 |
| S6★ | 3800 | 4000 | 1.05 | Two-Way | T10@125 | T8@175 | T10@125 |
Slab Design Notes (GF)
· Thickness: 125mm throughout
· All panels two-way (ly/lx < 2.0)
· Short span lx always gets main bars
· ★ S5, S6 (4m span) have closer spacing
· Top bars: extend L/4 from support face
· Cover: 20mm (moderate exposure)
· d(main) = 125−20−10/2 = 100mm
· Live Load assumed: 2.0 kN/m² (IS 875 P2)
· Thickness: 125mm throughout
· All panels two-way (ly/lx < 2.0)
· Short span lx always gets main bars
· ★ S5, S6 (4m span) have closer spacing
· Top bars: extend L/4 from support face
· Cover: 20mm (moderate exposure)
· d(main) = 125−20−10/2 = 100mm
· Live Load assumed: 2.0 kN/m² (IS 875 P2)
Slab Thickness Check
IS 456 SPAN/d RATIO| Span Type | lx | d reqd (l/26) | d prov. | Status |
|---|---|---|---|---|
| Short (S1-S4) | 3500mm | 135mm | 100mm | Increase to 150mm |
| Short (S5-S6) | 3800mm | 146mm | 100mm | Use 150mm ★ |
Revision Note
Span/d check suggests 150mm slab for S5/S6. For S1–S4 use 125mm with Fe500 and check deflection — acceptable for residential LL 2 kN/m².
Span/d check suggests 150mm slab for S5/S6. For S1–S4 use 125mm with Fe500 and check deflection — acceptable for residential LL 2 kN/m².
FF / Roof Slab Reinforcement Plan
Sheet 2 of 4 · +6450mm Level
125mm solid slab · Same grid · Lighter steel (reduced roof LL 1.5 kN/m²) · Main T10@150 · Dist T8@200
125
Depth mm
6
Slab Panels
T10
Main @150
T8
Dist @200
T10
Top @150
20mm
Cover
M20
Grade
+6450
Level mm
FF/Roof Slab Plan — Reinforcement at +6450mm
IDENTICAL GRID · SAME PANELS · REDUCED ROOF LOADING · T10@150 + T8@200T10@150 Main (lx)
T8@200 Dist (ly)
T10@150 Top bars
Waterproof zone
Roof Slab Panel Schedule
IS 456 · ROOF SLAB LL 1.5 kN/m²| Panel | lx | ly | ly/lx | Type | Bot lx | Bot ly | Top |
|---|---|---|---|---|---|---|---|
| RS1-4 | 3500 | 3800 | 1.09 | Two-Way | T10@150 | T8@200 | T10@150 |
| RS5-6★ | 3800 | 4000 | 1.05 | Two-Way | T10@125 | T8@175 | T10@125 |
Roof Slab Notes
· Same thickness 125mm, same grid
· Waterproofing: 50mm brick bat coba
· Or 4mm APP membrane + 25mm screed
· Parapet: 230mm brick, 900mm ht.
· Roof drainage: slope min 1:100
· Curing: min 14 days before loading
· Terrace LL: 1.5 kN/m² (IS 875 P2)
· Same thickness 125mm, same grid
· Waterproofing: 50mm brick bat coba
· Or 4mm APP membrane + 25mm screed
· Parapet: 230mm brick, 900mm ht.
· Roof drainage: slope min 1:100
· Curing: min 14 days before loading
· Terrace LL: 1.5 kN/m² (IS 875 P2)
GF vs FF Comparison
| Item | GF Slab | FF/Roof Slab |
|---|---|---|
| Thickness | 125mm | 125mm |
| Level | +3450mm | +6450mm |
| Main bar | T10@150 | T10@150 |
| Dist bar | T8@200 | T8@200 |
| Top bar | T10@150 | T10@150 |
| Cover | 20mm | 20mm |
| Live load | 2.0 kN/m² | 1.5 kN/m² |
| Extra | — | Waterproofing |
Slab Section Details & Reinforcement Arrangement
Sheet 3 of 4
Transverse section through slab showing bar positions · Cover · Top bar curtailment · Beam support
Section A–A · Mid-Span (Sagging)
BOTTOM BARS IN TENSION · T10 MAIN + T8 DISTSection B–B · Over Support (Hogging)
TOP BARS ACTIVE · T10@150 TOP + T10@150 BOT CONT.Slab-Beam Interface Detail
MAIN BAR ANCHORAGE · 90° BEND INTO BEAMSlab Build-Up / Layer Detail
GF & FF SLAB COMPOSITIONDesign Parameters Summary
IS 456 · BOTH SLABS| Parameter | GF Slab | FF Slab |
|---|---|---|
| Thickness D | 125mm | 125mm |
| Cover c | 20mm | 20mm |
| d (effective) | 100mm | 100mm |
| Concrete | M20 | M20 |
| Steel | Fe500 | Fe500 |
| Main bar (lx) | T10@150 | T10@150 |
| Dist bar (ly) | T8@200 | T8@200 |
| Top bars | T10@150 | T10@150 |
| Top bar extent | L/4 each side | L/4 each side |
| LL | 2.0 kN/m² | 1.5 kN/m² |
| SDL (FF) | 1.0 kN/m² | 2.0 kN/m² (WP) |
| Total w | ~8.1 kN/m² | ~8.3 kN/m² |
| Ast reqd (lx) | ~315 mm²/m | ~295 mm²/m |
| Ast prov (T10@150) | 524 mm²/m ✔ | 524 mm²/m ✔ |
Bar Bending Schedule — Slabs
Sheet 4 of 4
Complete bar schedule for GF slab + FF/Roof slab · All dimensions in mm · Weights are indicative
GF Slab — Full Bar Schedule
S1–S6 · BOTH DIRECTIONS · TOP BARS| Mark | Panel | Bar | Dir | Position | Length/bar | No. bars | Total m |
|---|---|---|---|---|---|---|---|
| M1 | S1–S4 | T10 | lx (main) | Bottom | 3900mm | 4×~27=108 | 421m |
| M2 | S5–S6 | T10 | lx (main) | Bottom | 4100mm | 2×~32=64 | 262m |
| D1 | S1–S4 | T8 | ly (dist) | Bottom | 3900mm | 4×~20=80 | 312m |
| D2 | S5–S6 | T8 | ly (dist) | Bottom | 4100mm | 2×~20=40 | 164m |
| T1 | All | T10 | Both | Top (hog.) | 2000mm | ~180 | 360m |
T10 Total (GF)
Main + Top: 1043m
Weight: ~642 kg
Weight: ~642 kg
T8 Total (GF)
Dist bars: 476m
Weight: ~188 kg
Weight: ~188 kg
GF Slab Steel Total: ~830 kg
· Volume GF slab: 7.6×11.0×0.125 = 10.45 m³
· Concrete M20 vol: 10.45 m³ ≈ 25.1 tonnes
· Steel @ 79 kg/m³: ~825 kg (close match ✔)
· Anti-crack mesh at slab edges
· Construction joint at beam centreline
· Slab to be poured monolithic with beams
· Volume GF slab: 7.6×11.0×0.125 = 10.45 m³
· Concrete M20 vol: 10.45 m³ ≈ 25.1 tonnes
· Steel @ 79 kg/m³: ~825 kg (close match ✔)
· Anti-crack mesh at slab edges
· Construction joint at beam centreline
· Slab to be poured monolithic with beams
FF/Roof Slab — Full Bar Schedule
RS1–RS6 · SAME GRID · WATERPROOFING ZONE| Mark | Panel | Bar | Dir | Position | Length/bar | No. bars | Total m |
|---|---|---|---|---|---|---|---|
| RM1 | RS1–4 | T10 | lx main | Bottom | 3900mm | 4×27=108 | 421m |
| RM2 | RS5–6 | T10 | lx main | Bottom | 4100mm | 2×32=64 | 262m |
| RD1 | RS1–4 | T8 | ly dist | Bottom | 3900mm | 4×20=80 | 312m |
| RD2 | RS5–6 | T8 | ly dist | Bottom | 4100mm | 2×20=40 | 164m |
| RT1 | All | T10 | Both | Top (hog.) | 2000mm | ~180 | 360m |
T10 Total (Roof)
Main + Top: 1043m
Weight: ~642 kg
Weight: ~642 kg
T8 Total (Roof)
Dist bars: 476m
Weight: ~188 kg
Weight: ~188 kg
Roof Slab Steel Total: ~830 kg
· Identical reinforcement to GF slab
· Waterproofing applied after curing
· Ensure 1% slope toward downspouts
· Expansion joint: 300mm foam board @12m
· Stainless steel chairs for bar positioning
COMBINED TOTAL SLAB STEEL
· T10: ~1284 kg (both floors)
· T8: ~376 kg (both floors)
· Grand Total: ~1660 kg slab steel
· Identical reinforcement to GF slab
· Waterproofing applied after curing
· Ensure 1% slope toward downspouts
· Expansion joint: 300mm foam board @12m
· Stainless steel chairs for bar positioning
COMBINED TOTAL SLAB STEEL
· T10: ~1284 kg (both floors)
· T8: ~376 kg (both floors)
· Grand Total: ~1660 kg slab steel